High-Standard Factory with Multiple Specifications

Factory specification approx. 1100-3700m²/storey

The park specialises in high standard factory buildings for surface treatment companies, which can be rented, sold or customised to meet individual needs.
  • 01
    The park is strategically designed to build factories of various specifications based on the specific processes and plating types in the surface treatment industry, fully meeting the production equipment and process needs of resident enterprises.
  • 02
    All factories are arranged in a back-to-back layout, effectively addressing logistical needs and personnel access.
  • 03
    Independent elevators are provided on each floor for convenient use, enhancing cargo transport efficiency.
  • 04
    Factories are equipped with wastewater collection and exhaust gas treatment systems, reducing the cost of gas pipelines for enterprises and effectively lowering safety risks.
  • 05
    With well-planned functional zones and customizable spaces, the factories meet diverse production and office requirements, providing high-quality, adaptable spaces for enterprises.
  • KIMOU (Huizhou) Surface Treatment Recycling Eco-Industrial Park
    KIMOU (Huizhou) Surface Treatment Recycling Eco-Industrial Park
    KIMOU (Huizhou) Surface Treatment Recycling Eco-Industrial Park
    KIMOU (Huizhou) Surface Treatment Recycling Eco-Industrial Park
    56 Factory Buildings Completed, with an Area of Approximately 510,000
  • KIMOU (Tianjin) Surface Treatment Recycling Eco-Industrial Park
    KIMOU (Tianjin) Surface Treatment Recycling Eco-Industrial Park
    KIMOU (Tianjin) Surface Treatment Recycling Eco-Industrial Park
    61 Factory Buildings Completed, with an Area of Approximately 400,000
    Floor height 7.6m, floor loading 1.8t/m2
    Type A
    24x50 metres
    Type B
    24x58 metres
    Type C
    24x102 metres
    Type D
    23x75m
    Type E
    23x82.5 metres
    Type F
    23x90m
    Type G
    23x120m
    Type H
    23x135 metres
  • KIMOU (Central China) Surface Treatment Recycling Eco-Industrial Park
    KIMOU (Central China) Surface Treatment Recycling Eco-Industrial Park
    KIMOU (Central China) Surface Treatment Recycling Eco-Industrial Park
    Planned to Construct 54 Factory Buildings,16 Factory Buildings Completed, with an Area of Approximately 155,000
    Floor height 7.9m-16m, floor loading 1.8t/m2
    Type A
    24x75 metres
    Type B
    24 x 90 metres
    Type C
    24x120 metres
  • KIMOU (Southwest China Qingshen) Surface Treatment Recycling Eco-Industrial Park
    KIMOU (Southwest China Qingshen) Surface Treatment Recycling Eco-Industrial Park
    KIMOU (Southwest China Qingshen) Surface Treatment Recycling Eco-Industrial Park
    Planned to Construct 53 Factory Buildings ,11 Factory Buildings Completed, with an Area of Approximately 110,000
    The ground floor is 9.9 metres high, the second to fourth floors are 7.9 metres high, and the floor loading is more than 2 tonnes per square metre.
    Type A
    24x46 metres
    Type B
    24x62 metres
    Type C
    24x77 metres
    Type D
    24x92 metres
    Type E
    24x122 metres
  • KIMOU (East China) Surface Treatment Recycling Eco-Industrial Park
    KIMOU (East China) Surface Treatment Recycling Eco-Industrial Park
    KIMOU (East China) Surface Treatment Recycling Eco-Industrial Park
    Planned to Construct 56 Factory Buildings,10 Factory Buildings Completed, with an Area of Approximately 120,000
    The ground floor is 9.9 metres high, the second, third and third floors are 8.9 metres high, the fourth and fifth floors are 7.9 metres high, and the floor loading is 1.8 tonnes per square metre.
    Type A
    24x60 metres
    Type B
    24x60 metres
    Type C
    24x120 metres

Admission Process

  • Entry Review
    Entry Review
    The enterprise submits a factory setup plan and related design documents to apply for entry into the park. The park reviews the entry requirements of the enterprise.
  • Contract Signing
    Contract Signing
    Both the park and the enterprise sign the relevant entry contract.
  • Project Approval
    Project Approval
    The enterprise applies for various administrative permits and documents from government agencies, with a copy filed in the park’s records.
  • Renovation Management
    Renovation Management
    The park provides comprehensive oversight of the enterprise’s renovation design and process.
  • Project Inspection
    Project Inspection
    The park conducts a full inspection of the enterprise's renovation. Upon passing inspection, the enterprise may proceed with testing and trial production.
  • Entry Management
    Entry Management
    The enterprise carries out regular production in accordance with national, industry, local, and park-specific regulations.