High-Standard Factory with Multiple Specifications
Factory specification approx. 1100-3700m²/storey
The park specialises in high standard factory buildings for surface treatment companies, which can be rented, sold or customised to meet individual needs.
-
01The park is strategically designed to build factories of various specifications based on the specific processes and plating types in the surface treatment industry, fully meeting the production equipment and process needs of resident enterprises.
-
02All factories are arranged in a back-to-back layout, effectively addressing logistical needs and personnel access.
-
03Independent elevators are provided on each floor for convenient use, enhancing cargo transport efficiency.
-
04Factories are equipped with wastewater collection and exhaust gas treatment systems, reducing the cost of gas pipelines for enterprises and effectively lowering safety risks.
-
05With well-planned functional zones and customizable spaces, the factories meet diverse production and office requirements, providing high-quality, adaptable spaces for enterprises.
-
KIMOU (Huizhou) Surface Treatment Recycling Eco-Industrial Park56 Factory Buildings Completed, with an Area of Approximately 510,000 m²
-
KIMOU (Tianjin) Surface Treatment Recycling Eco-Industrial Park61 Factory Buildings Completed, with an Area of Approximately 400,000 m²
Floor height 7.6m, floor loading 1.8t/m2-
Type A24x50 metres
-
Type B24x58 metres
-
Type C24x102 metres
-
Type D23x75m
-
Type E23x82.5 metres
-
Type F23x90m
-
Type G23x120m
-
Type H23x135 metres
-
-
KIMOU (Central China) Surface Treatment Recycling Eco-Industrial ParkPlanned to Construct 54 Factory Buildings,16 Factory Buildings Completed, with an Area of Approximately 155,000 m²
Floor height 7.9m-16m, floor loading 1.8t/m2-
Type A24x75 metres
-
Type B24 x 90 metres
-
Type C24x120 metres
-
-
KIMOU (Southwest China Qingshen) Surface Treatment Recycling Eco-Industrial ParkPlanned to Construct 53 Factory Buildings ,11 Factory Buildings Completed, with an Area of Approximately 110,000 m²
The ground floor is 9.9 metres high, the second to fourth floors are 7.9 metres high, and the floor loading is more than 2 tonnes per square metre.-
Type A24x46 metres
-
Type B24x62 metres
-
Type C24x77 metres
-
Type D24x92 metres
-
Type E24x122 metres
-
-
KIMOU (East China) Surface Treatment Recycling Eco-Industrial ParkPlanned to Construct 56 Factory Buildings,10 Factory Buildings Completed, with an Area of Approximately 120,000 m²
The ground floor is 9.9 metres high, the second, third and third floors are 8.9 metres high, the fourth and fifth floors are 7.9 metres high, and the floor loading is 1.8 tonnes per square metre.-
Type A24x60 metres
-
Type B24x60 metres
-
Type C24x120 metres
-
Admission Process
-
Entry ReviewThe enterprise submits a factory setup plan and related design documents to apply for entry into the park. The park reviews the entry requirements of the enterprise.
-
Contract SigningBoth the park and the enterprise sign the relevant entry contract.
-
Project ApprovalThe enterprise applies for various administrative permits and documents from government agencies, with a copy filed in the park’s records.
-
Renovation ManagementThe park provides comprehensive oversight of the enterprise’s renovation design and process.
-
Project InspectionThe park conducts a full inspection of the enterprise's renovation. Upon passing inspection, the enterprise may proceed with testing and trial production.
-
Entry ManagementThe enterprise carries out regular production in accordance with national, industry, local, and park-specific regulations.