Park Profile
Kimou (East China) Surface Treatment Circular Eco-Industrial Park is invested and constructed by Kimou Environmental Holding Limited, and is the fifth surface treatment industrial park under the Group. It is located in Binjiang Town, Taixing City, and is also part of Taixing Economic Development Zone.
The industrial park spans a total planned area of approximately 560,000 ㎡, with a gross floor area of about 860,000 ㎡—including 710,000 ㎡ dedicated to factory buildings—and is designed with a daily wastewater treatment capacity of 20,000 tonnes. The development is being carried out in three phases, with Phase I and the first stage of Phase II already completed, providing around 300,000 ㎡ of high-standard factory space and 5,000 ㎡ of customized workshops, alongside supporting facilities such as an advanced electroplating wastewater treatment center and a risk control center. The factory buildings in Phase II's first stage will be delivered and begin operations in the first half of 2025, while the second stage is set to break ground in the latter half of the year, with completion expected by the second half of 2026.
The park is planned to be built in three phases, of which the first phase will consist of 10 factory premises with a floor area of approximately 120,000 ㎡. It also supports the construction of an electroplating wastewater treatment centre, a risk control emergency command centre, a water body wind control collection centre, an accident emergency pool, an underground comprehensive pipeline corridor and public supporting facilities such as water supply, power supply and steam supply.
The park will adhere to the concept of ecological priority and green development, and strive to build a surface treatment demonstration park in East China with advanced technology, resource conservation, recycling efficiency and good ecology. The park will leverage on the geographical centre of the Yangtze River Delta, which connects the north and south, the inland and the river and the sea, to help transform and upgrade the surface treatment industry in the Yangtze River Delta region and even in East China, and to facilitate the green, low-carbon and sustainable development of the industry.
The industrial park spans a total planned area of approximately 560,000 ㎡, with a gross floor area of about 860,000 ㎡—including 710,000 ㎡ dedicated to factory buildings—and is designed with a daily wastewater treatment capacity of 20,000 tonnes. The development is being carried out in three phases, with Phase I and the first stage of Phase II already completed, providing around 300,000 ㎡ of high-standard factory space and 5,000 ㎡ of customized workshops, alongside supporting facilities such as an advanced electroplating wastewater treatment center and a risk control center. The factory buildings in Phase II's first stage will be delivered and begin operations in the first half of 2025, while the second stage is set to break ground in the latter half of the year, with completion expected by the second half of 2026.
The park is planned to be built in three phases, of which the first phase will consist of 10 factory premises with a floor area of approximately 120,000 ㎡. It also supports the construction of an electroplating wastewater treatment centre, a risk control emergency command centre, a water body wind control collection centre, an accident emergency pool, an underground comprehensive pipeline corridor and public supporting facilities such as water supply, power supply and steam supply.
The park will adhere to the concept of ecological priority and green development, and strive to build a surface treatment demonstration park in East China with advanced technology, resource conservation, recycling efficiency and good ecology. The park will leverage on the geographical centre of the Yangtze River Delta, which connects the north and south, the inland and the river and the sea, to help transform and upgrade the surface treatment industry in the Yangtze River Delta region and even in East China, and to facilitate the green, low-carbon and sustainable development of the industry.
-
2023
year
Commencement of operations -
56
Ten thousand square metres
Footprint (of a building, piece of equipment etc) -
20000
T/D
Planning wastewater treatment capacity -
200Planning to enter the park


Park Promotional Video


Contact Us

-
Address:North of Provincial Highway 504, East of Yanjiang High-level Highway, Taixing City, Taizhou City, Jiangsu Province
-
Tel:(+86)0523 8718 0688